|
||||||
|
|
||||||
Installation Guide
|
Preparation - Underlayment and Subfloor
Acclimate panels 24 hours in the room and 48 hours in more extreme conditions. Floor joists and subfloors expand and contract with changes in humidity and temperature therefore MULTIPLY® underlayment and the subfloor assemblies must be adjusted to the surrounding room conditions that will exist during occupancy.
The room must be kept dry and ventilated and at a constant temperature of 70º F (21ºC) during and at least 48 hours before and after installation. Before installation, whether in new construction or an existing floor in a renovation, it is highly recommended the moisture content of the subfloor be measured using a moisture meter to determine site conditions are right for installation. Refer to the chart below:
CAUTION: A word about Seam “Telegraphing” Seam telegraphing problems are not the result of defective underlayment panels but can usually be traced to two main causes:
|
|||||
|
|
||||||
|
||||||